Application Deadline: May 31st 2019
EGBIN POWER PLC, Lagos is one of the biggest additions to the electricity industry in Nigeria. Often seen as the biggest single generating power station in Black Africa, it was built to meet the every rising demand for electricity in Lagos and its environs.
Before the construction of the Egbin Power Plc, Lagos, the Ijora Power Station which is reputed as the oldest power generating plant in the country was the main source of electricity supply around.
The Student should be on Second CLass Upper (2:1) or its equivalent as at the time of submitting the application
Field of Study
Engineering
Applied Industrial Science
Environment Technology
Information Technology
Finance
Duration: July 2019 – December 2019